- Thread starter
- #41
Perhaps, the end of the remodel project is in sight. Finally, something worthwhile to report.
Painting is virtually largely done. I even started a very slight bit of aquarium plumbing. The prep work to the drain and water supplies is basically done. I'll install the RO unit later this week. It should be just a simple matter of plugging in a few 1/4" hoses and installing the float valve in the reservoir. In the photos, you can see the door header ready to be installed tomorrow. The tile is laid out for pattern purposes. It will all be set in place tomorrow. Then grout, then replace the baseboard, fix the edge of the carpet, a bit of touchup paint, installation of the doorknob...... and then I can actually move the stand into place. Once I verify that it looks good centered in the room, the rest of the plumbing and hardware installation can go pretty quickly.
Who knows, maybe within a few weeks I'll actually put water in the thing.
Painting is virtually largely done. I even started a very slight bit of aquarium plumbing. The prep work to the drain and water supplies is basically done. I'll install the RO unit later this week. It should be just a simple matter of plugging in a few 1/4" hoses and installing the float valve in the reservoir. In the photos, you can see the door header ready to be installed tomorrow. The tile is laid out for pattern purposes. It will all be set in place tomorrow. Then grout, then replace the baseboard, fix the edge of the carpet, a bit of touchup paint, installation of the doorknob...... and then I can actually move the stand into place. Once I verify that it looks good centered in the room, the rest of the plumbing and hardware installation can go pretty quickly.
Who knows, maybe within a few weeks I'll actually put water in the thing.