Welcome to ScapeCrunch

We are ScapeCrunch, the place where planted aquarium hobbyists come to build relationships and support each other. When you're tired of doom scrolling, you've found your home here.

Journal 80cm (32”) collectoritis tank

  • Thread starter Thread starter JacksonL
  • Start date Start date
  • Tagged users Tagged users None
@Kwyet here are the bases I have TNGAMFGT 2 Pack Pull Out Cabinet Organizer, Expandable (12.6-20.5In) Cabinet Roll Out Drawers,Upgraded No-Drill Chest of Pull Out Drawers for Cabinets with 3 Adjustable Slides (Black, 16.5 in Deep) : Amazon.com.au: Kitchen & Dining
They have three rollers/runners and can be screwed down to the cabinet or there are heavy duty sticky strips if you don’t want holes in the cabinet base.
I used them and like them a lot, only negative is they do not extend that far. Think half their length so if your cabinet is deep don't set them all the way back.
 
I’m still in the “try a bunch of different plants, and maybe some will survive “ mode, which can lead to collectoritis..

Nice tank! and wow your running sheet is detailed.
Really glad to hear that isn't something I am uniquely afflicted with lol. I "SWEAR" that my next rescape will be limited on the varieties...
 
In this last photo, is water flowing from top to bottom?
Flow is bottom to top. Enters in the bottom left barb the through the reactor, gate valve, then out the top centre barb

Edit: here is the flow from the filter. Red is the reactor flow, purple the bypass.
1776985439090.webp
 
Last edited:
I used them and like them a lot, only negative is they do not extend that far. Think half their length so if your cabinet is deep don't set them all the way back.
Thanks for the tip, and I’m glad to hear you liked them. I will place them at the front.
I only need them to come out about halfway, it is primarily to allow the prefilter to be removed without having to tilt the filter, as the biomaster is so tall and my cabinet quite short.
 
Flow is bottom to top. Enters in the bottom left barb the through the reactor, gate valve, then out the top centre barb

Edit: here is the flow from the filter. Red is the reactor flow, purple the bypass.
View attachment 16447
So this will certainly work, but it's still an example from this post of 5a:

1776992372032.webp

You're almost there. The setup you are sharing still immediately splits the flow 50/50 because of the "Tee" setup you have.

Your setup currently:
1776992962865.webp

What this means is, at most, you will be able to control maximum 50% of the flow with the red valve from zero to 50. It will work, but if you want full control over the flow through your reactor, you should design it like this:

Full flow control:1776993012969.webp

I think your parts can just be rearranged to make this happen. Again, your design above would work, you just wouldn't get full control over the flow. At 100% open valve, you'll only get max 50% flow through the valve.

With the latter design, if you open the valve 100%, you'll get ~100% flow through the reactor (minus whatever is lost to friction). Even if it's not 100%, it will be more like 80-90%... far more than the initial design!
 

Attachments

  • 1776992835669.webp
    1776992835669.webp
    7.2 KB · Views: 0
So this will certainly work, but it's still an example from this post of 5a:

View attachment 16448

You're almost there. The setup you are sharing still immediately splits the flow 50/50 because of the "Tee" setup you have.

Your setup currently:
View attachment 16450

What this means is, at most, you will be able to control maximum 50% of the flow with the red valve from zero to 50. It will work, but if you want full control over the flow through your reactor, you should design it like this:

Full flow control:View attachment 16451

I think your parts can just be rearranged to make this happen. Again, your design above would work, you just wouldn't get full control over the flow. At 100% open valve, you'll only get max 50% flow through the valve.

With the latter design, if you open the valve 100%, you'll get ~100% flow through the reactor (minus whatever is lost to friction). Even if it's not 100%, it will be more like 80-90%... far more than the initial design!
Thank you for taking the time for such an awesome reply. I am in no rush, so I will keep having a play. The length of the gate valve and tee for the bypass return do limit the configurations though. I doubt I will need more than 50% through the reactor at this stage though. With a tank upgrade, will come a cabinet upgrade too and I will have more options.
I may trial it as is, and assess it’s efficiency for a week, then see what I can do to improve it if required.
 

Top 10 Trending Threads